Engineers at a nuclear facility had an interesting challenge. They wanted to adhere a new concrete roof on top of an existing concrete roof. Our technical specialists were called in to come up with an appropriate solution that would have enough adhesion. The solution included removing the top layer of insulation, preparing the concrete, and spraying ENECLAD SuperBond to an area that totaled ... Read More...